HVAC engineering, sized on your plan.
Airflows, air changes and heat loads are calculated room by room from your layout and zoning. The ducts are routed from your air handling units, sized and checked, and the fan power gives a first energy cost.
- ACH
- m³/h
- Heat loads
- HEPA
- Ducts

Built for pharma, step by step.
- 01
Airflows and air changes
Each room's supply airflow comes from its air change rate (ACH) and its volume, net of pillars. The ACH follows the grade by default and stays editable.
- 02
Air balance with the zoning
The exhaust of each room is its supply minus the air leaking through its doors at the GMP pressures. A room that leaks more than it receives is flagged.
- 03
Heat and moisture loads
Heating and cooling loads of the supply air, plus the heat of the personnel and of the equipment placed in each room, and the moisture they release.
- 04
Units, ducts and energy
Fan filter units or HEPA terminals laid out on each ceiling, ducts routed from the AHUs and sized for the target velocity, pressure drop, fan power and yearly energy cost.
How the HVAC is calculated
Standard engineering methods, step by step. The formulas and every constant are one click away in the editor, and settings such as velocities or energy prices can be changed per project.
- 01
Supply airflow
The airflow is the air change rate times the net volume of the room. Default rates follow the grade.
- 02
Air balance
What a room doesn't extract leaks through its doors: that is what holds its pressure above its neighbours.
- 03
Thermal loads
Sensible load of the supply air at standard air properties, plus internal gains.
- 04
Ceiling units
Grade A and B rooms get fan filter units by default, other rooms ducted HEPA terminals. Units that don't fit the ceiling are flagged.
- 05
Duct sizing and pressure drop
Each section is sized for the target velocity and rounded to standard sizes, then its pressure drop follows Darcy-Weisbach, with the Swamee-Jain friction factor.
- 06
Fan power and energy
The fans are sized on the most demanding path. The yearly cost uses your operating hours and electricity price.
Goes hand in hand with
HVAC checked
Air changes, air balance with door leakage, ceiling units, duct sizes and velocities.
GMP zoning checked
Pressure cascades, airlocks, grade changes and containment, checked at every door.
1,000+ equipment library
Real pharma equipment, with its dimensions, heat gain and GMP data.
Frequently Asked Questions
How are air change rates calculated?
For each room, the supply airflow is its air change rate times its volume net of pillars. The default rate follows the grade (360 for A and B, 60 for C, 25 for D) and can be changed room by room.
Are equipment heat gains included?
Yes. Equipment from the library carries its heat gain, which is added to the cooling load of the room it is placed in, with 0.1 kW per person.
How are the ducts sized?
Each section is sized for a target velocity (6 m/s by default) within the ceiling void, and its pressure drop is calculated with Darcy-Weisbach. The fans are sized on the most demanding path.
Can the HVAC results be exported?
Yes. They appear in the PDF feasibility report and in the Excel exports.
Explore the other features
Ready to modernize your facility design?
Join leading pharmaceutical companies, CDMOs, and engineering firms using PharmaTwin.