GMP zoning, checked as you design.
Assign a grade to every room, set the pressure cascade and the airlocks, and see design errors flagged at the door where they occur, with the rule behind each one and a suggested fix, before they reach validation.
- EU GMP Annex 1
- ISO 14644
- Cascades
- Pa

Built for pharma, step by step.
- 01
Classify every room
Give each room its EU GMP grade (A to D) and ISO class, by hand or proposed by the AI with the building. Each grade comes with a default pressure you can adjust.
- 02
Set cascades and airlocks
Cascade airlocks take the midpoint of the rooms around them, bubbles sit above them and sinks below. High activity rooms keep their air in.
- 03
Catch design errors early
Inverted cascades, pressure steps that are too low or too high, grade changes without an airlock and exposed pillars in Grade A and B rooms are flagged at their location, with a fix.
- 04
Door leakage, passed to HVAC
The air leaking through each closed door is computed from its size, its sealing and the pressure step, then used by the HVAC engineering to balance each room.
How the zoning is checked
No black box: each result comes from the grades, pressures and doors of your plan, run through fixed rules. The same explanation is one click away in the editor.
- 01
Room pressures
Pressures are relative to the outside of the building. Each grade has a default, and airlocks take theirs from the rooms they connect.
- 02
Checks at every door
Each access is checked on the pressure step it carries. The higher grade must hold the higher pressure, and grades more than two levels apart should not meet.
- 03
Containment
For high activity or toxic products the cascade is inverted: the air must flow into the room, so it sits below its neighbours or is served through a bubble or a sink airlock.
- 04
Door leakage
Air leaks through the gap around a closed door, 3 mm without seal and 0.3 mm for hermetic doors. A 1 × 2.1 m door without seal under 15 Pa leaks about 204 m³/h.
Goes hand in hand with
GMP zoning checked
Pressure cascades, airlocks, grade changes and containment, checked at every door.
HVAC checked
Air changes, air balance with door leakage, ceiling units, duct sizes and velocities.
Flows checked
Clean and dirty crossings, packages too large for a door and saturated rooms.
Frequently Asked Questions
Which standards does the zoning follow?
The EU GMP grades A to D with their ISO 14644 classes, and the cascade principles of EU GMP Annex 1: the cleaner room holds the higher pressure, and grade changes go through an airlock.
What pressure step should I use between grades?
EU GMP Annex 1 suggests 10 to 15 Pa between adjacent grades, and the default pressures are 10 Pa apart. PharmaTwin flags any step under 5 Pa between different grades, and any step of 30 Pa or more, where doors become hard to open.
Does it replace the qualification of the facility?
No. It secures the design and documents it; final validation still requires on-site qualification according to your VMP.